Page Options
>> >>view
Main structure of Xiangshan Station on Nansha-Zhongshan railway topped out
2025-09-19

0919-5.jpg


The Zhongshan section of the Nansha-Zhongshan Intercity Railway achieved new milestones on September 17 with the topping-out of Xiangshan Station's main structure. Construction now shifts to mechanical and electrical installation, track laying and interior finishing phases.


The entire railway spans 47.6 km, including 28.5 km within Zhongshan. It features 12 newly built stations (one elevated), with 9 stations scheduled for initial operation.


Following Qijiang New Town (formerly Shijilu), Zhongshan, Torch and Xingzhong, Xiangshan Station becomes the fifth Zhongshan-section station to be capped.


As the ninth station along the Zhongshan section, Xiangshan Station comprises a two-level underground structure with partial third-level extension and four entrances. Upon completion, it will significantly enhance citizen mobility and regional transit connectivity.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us