Tanzhou Avenue's main line has been in trial operation since July 25. Ramps A and B of Tanzhou Expressway are also in trial run, connecting the two roads with Zhuhai.
Only the main line is accessible, and only the auxiliary roads at Nantan Road are temporarily operational for entry/exit between the ramps and Nantan Road. A 5-meter height limit applies to the entire route.