Page Options
>> >>view
First PEDF integrated project in ZS put into operation
2025-01-20

Zhongshan's first park-based electricity generator-grid-power load-power storage (or photovoltaic-energy storage-direct current-flexibility, PEDF) integrated project was put into operation in Zhongshan Centrone Group's office park on January 16, aiming to create a demonstration "micro-grid+" low-carbon park.


0120-3.jpg


The project is constructed by Xingzhong Energy under Zhongshan Centrone Group, with an approximate installed capacity of 81 kilowatts.


During its 25-year life cycle, the project is expected to generate about 800,000 kWh of electricity while significantly reducing coal emissions by around 640 tons and carbon dioxide emissions by over 1,800 tons.


Generator-grid-power load-power storage integration is a new-type power operation mode with overall planning of supply, grid, load and storage of power.


Advanced PEDF technologies are adopted to optimize the direct-current load of photovoltaic power generation, power storage and charging piles in a park as well as to achieve effective, collaborative, integrated operation of power generation, power grid, power load and energy storage systems.


Compared with the traditional AC power schemes, the new scheme increases the energy utilization efficiency by 10-15% and ensures a more stable and reliable power generation process.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us