Page Options
>> >>view
Zhongshan's first integrated supercharging station for heavy trucks
2025-12-12

Zhongshan unveiled its first integrated PV, energy storage and supercharging demonstration station for electric heavy trucks at Zhongshan Port & Shipping company on December 10, with the first 26 electric heavy trucks delivered at the same time. 


1212-5.jpg


Developed by Zhongshan Port & Shipping, the station integrates distributed photovoltaic power generation, massive energy storage and intelligent supercharging.


1212-5-2.jpg


Phase one features two 2,000 kVA box-type transformers and 16 charging guns, enabling simultaneous dual-gun charging for 8 heavy trucks.


The carport rooftop is equipped with 240 square meters of solar panels, featuring a rated peak power of 53 kW and an annual electricity generation of 80,000 kWh. This setup is supported by two 241 kWh liquid-cooled energy storage cabinets, enabling a full-scenario energy closed-loop that includes self-consumption, surplus energy storage, peak-valley regulation, and emergency power supply.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us