
A 32.6-meter-long, 714-ton double-track prefabricated box girder was precisely positioned at the Minzhong beam fabrication yard in Torch High-Tech Zone on November 8.
This marked the successful installation of the first box girder for Section 10 of the Shenzhen–Jiangmen Railway, officially launching the section's girder erection phase.