The pre-construction work of Xingzhong Station on the Nansha-Zhongshan Intercity Railway commenced on October 10 as large-scale mechanical equipment were placed.
From 22:00 on October 10 to 24:00 on December 22, certain sections on the east side of Xingzhong Avenue and the north side of Sunwen East Road would be enclosed.
It is important to note that during this period, Xinghua Road (Xingzhong Avenue-Kangle Street section) operates as a one-way road from east to west, while Xinglong Street (Xingzhong Avenue-Longjing Street section) operates as a one-way road from west to east.
"During the construction period, it is strongly recommended that residents avoid using Xingzhong Avenue as much as possible and instead take alternative routes via Haocheng Road and Jinying Street," stated the construction unit chief.