Page Options
>> >>view
Steel box girder section of Hengmen West Grand Bridge ZS side joined
2023-07-03

0703-4.jpg


On June 28, as the last steel box girder segment was laid in place, the Hengmenxi Grand Bridge (Zhongshan side) of the Nansha-Zhongshan Highway was joined up.


The 32.4-kilometer Nansha-Zhongshan Highway straddles Guangzhou and Zhongshan, connecting to Zhuhai in the south, Jiangmen in the west and Dongguan in the east. Its auxiliary line, connected with the Shenzhen-Zhongshan Bridge, directly leads to Shenzhen.


The Hengmen West Grand Bridge, a major part of the Nansha-Zhongshan Highway, is a single-pylon integral steel box girder cable-stayed bridge with the largest span of its kind currently under construction in China. The bridge has a full length of 912 meters, a main span of 390 meters, and a pylon height of 210 meters.


The Nansha-Zhongshan Highway is scheduled to open to traffic by the end of 2024, after which it will take less than 15 minutes to drive from Guangzhou's Nansha District to Zhongshan.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us