Page Options
>> >>view
GZJ Expressway (Phase IV) to open to traffic by year end
2021-10-25

1025-3.jpg


The last 100 meters of asphalt road surface of the Phase IV of the Guangzhou-Zhongshan-Jiangmen Expressway (GZJ Expressway) was finished on October 21, indicating the the completion of the pavement work of the whole line.


GZJ Expressway (Phase IV) starts from Dongfeng Interchange and ends at Nantou North Interchange, running a total length of 6.013 kilometers. The 3.23-kilometer double-deck bridge section was constructed for both highway and railway use. The upper level is part of the Guangzhou-Zhongshan-Jiangmen Expressway and the lower level is part of the Nansha Port Railway.


The Expressway has 6 lanes in either direction with a speed limit of 100km/h.


According to the plan, GZJ Expressway (Phase IV) will be qualified for opening to traffic in late November, and it is planned to officially open together with the Nansha Port Railway by the end of this year to makeDongfeng- and Nantou-based residents' travel more convenient.


GZJ Expressway runs through Guangzhou, Zhongshan, Foshan and Jiangmen cities, with a total length of about 67 kilometers.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us