Page Options
>> >>view
30th pipe section of Shenzhen-Zhongshan Bridge tunnel installed
2022-09-23

0923-2.jpg

The multi-purpose vessel Yihang Jin'an 1 sails to the installation site carrying the E21 pipe section. [Photo by Miao Xiaojian]


The successful installation of the E21 pipe section of the Shenzhen-Zhongshan Bridge tunnel was announced in the early morning on September 21. The installation promptly was measured to meet the acceptance and evaluation standards.


This is the 30th pipe section installed on the Shenzhen-Zhongshan Bridge tunnel. So far, 4,702.8 meters of the immersed tunnel have been finished, with only two pipe sections and one final joint left to be installed.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us