Page Options
>> >>view
Offshore box girders of Shenzhen-Zhongshan Bridge 60% erected
2022-07-07

0707-8.png


The 200th box girder of the offshore non-navigable bridge of the Shenzhen-Zhongshan Bridge was erected on July 5. So far, 60% of the steel box girders have been erected.


The 200th box girder is 60 meters long, 20 meters wide, 3.5 meters high and weighs about 2,500 tons. It is transported and erected by "Tianyi", an integrated crane ship independently developed by China Railway Major Bridge Engineering Group.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us