Page Options
>> >>view
East main tower of Zhongshan Bridge seals its top
2021-09-23

0923-3.jpg


While families reunited for the Mid-Autumn Festival on September 21, the east main tower of the Zhongshan Bridge of the Shenzhen-Zhongshan Bridge sealed its top. So far, the 4 main towers of the Lingdingyang and Zhongshan Bridges of the Shenzhen-Zhongshan Bridge had all sealed their tops and the next stage of construction on the bridge superstructure has begun.


The Zhongshan Bridge of the Shenzhen-Zhongshan Bridge is a double-tower cable-stayed bridge. After completion, its main towers will be 213.5 meters high, equivalent to the height of a 70-story building.


At present, construction on the bridges, islands, tunnels and underwater interchanges of the Shenzhen-Zhongshan Bridge are pressing ahead. The high-precision installation of 13 tunnel pipe sections exceeding 2,000 meters in total length have been completed.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us