Page Options
>> >>view
Lower deck of Qijiang River Bridge opens to traffic
2023-04-18

0418-4.jpg


Around 8am on April 15, the lower deck of Qijiang River Bridge on South Outer Ring road opened to traffic on a trial basis, and the section from Yongan No.1 Road to Cuijing Avenue resumed traffic with a speed limit of 40 km/h.


With the trial opening of the lower deck, east-west traffic on the bridge has resumed to ease the traffic pressure on Zhongshan No.2 Bridge on Bo'ai Road.


The Qijiang River Bridge is now closed to non-motor vehicles and pedestrians. The upward and downward bypasses of Chengnan Road within the trial section are under construction and are scheduled to open to traffic in May. The section from Cuijing Avenue in South Outer Ring to National Highway G105 is also under construction.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us