Page Options
>> >>view
Good start made for Shenzhen-Zhongshan Bridge construction in 2021
2021-01-26

0126-5.jpg


The millimeter precision connection between the E7 tube section of the underwater tunnel of Shenzhen-Zhongshan Bridge and the already installed section was completed on January 22, 2021. So far, the total length of the undersea tunnel completed has reached 1,113.5 meters.


The E7 section meets the standard specifications with a length of 165 meters, a width of 46 meters, a height of 10.6 meters, and a weight of about 80,000 tons. The installation was completed 34 meters underwater, the deepest so far since the beginning of the Shenzhen-Zhongshan Bridge's immersed tunnel construction.


The transportation and installation of 8 immersed tubes for the undersea tunnel project will be completed this year, and the total distance of the tunnel completed will exceed 2,200 meters.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us