Front-line workers were seen carrying the Z-shaped steel beam yesterday. The much-anticipated Xiaolan Station of the Guangzhou-Zhuhai light railway came to the ending phase of constructing a 200-meter long steel weather shed. As was introduced by a construction leader, it is expected to be finished by Aug. 10 and then the installation of platform tracks will start.