Page Options
>> >>view
First stay cable of Zhongshan Bridge installed
2022-01-10

0110-3.jpg


After 8 hours of continuous operation, the first stay cable of the Zhongshan Bridge of the Shenzhen-Zhongshan Bridge was installed on January 5.


Cable installation has now begun on the Zhongshan bridge, laying the foundation for the closure of the main section.


Zhongshan Bridge is a twin-tower cable-stayed bridge, which is one of the key project of the Shenzhen-Zhongshan Bridge. Its main span is 580 meters long, with two main towers in the east and west.


The bridge has 120 stay cables, weighing a total of about 1,945 tons. The first stay cable installed is about 99 meters long and weighs about 4 tons.

Close】 【Print
ICP Registration Number: 粤ICP备 11005604号
Police Registration Number: 44200002442868
Website ID: 4420000052
Sponsored by:  Office of Zhongshan Municipal People's Government
Technical Support:   Information Center of Zhongshan
Without written authorization from  Zhongshan Municipal People’s Government, the content of the site shall not be republished or used in any form.
About Us | Site Map| Privacy Statement| Contact us